欧美日韩性大香蕉|精品无码成人视频|永久久久久久久久|日韩加勒比偷拍网|婷婷伊人久久蜜桃|亚洲理论中文字幕|中文无码黄色Av|三级一区二区三区|超碰在线精品专区|国语对白一级A片

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Updated: 2014-04-01

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Electromechanical Equipment Installation at the Geheyan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.