欧美日韩性大香蕉|精品无码成人视频|永久久久久久久久|日韩加勒比偷拍网|婷婷伊人久久蜜桃|亚洲理论中文字幕|中文无码黄色Av|三级一区二区三区|超碰在线精品专区|国语对白一级A片

   
 
 
Home > Updates

Desertification control along railway route

By Zhao Xiao (chinadaily.com.cn)

Updated: 2017-03-14

Desertification control along railway route

Workers fasten sand grids near the Linhe-Ceke railway on March 6. [Photo/Xinhua]

Hundreds of staffers from Hohhot Railway Station worked on controlling desertification along the Linhe-Ceke railway in sparsely-populated deserts.

Sand-control measures focus on engineering and biological projects including building sand grids, digging sand ditches, planting drought-tolerant eremophyte, and embedding branches as sand-preventing barriers.

Trains shuttle from Linhe in Bayannur to Ceke in Alxa League, traveling across the Ulanbuh Desert and Badain Jaran Desert.

Since it began running in 2009, the Linhe-Ceke railway has suffered a lot from being buried by sand several times.

To handle the shifting desert, Hohhot Railway Station employed hundreds of workers to use scientific methods to control the distribution of sand along the route.

Previous Page 1 2 3 4 5 Next Page

Copyright ? 2013 China Daily All Rights Reserved
Sponsored by the Inner Mongolia Autonomous Region Government
Powered by China Daily