欧美日韩性大香蕉|精品无码成人视频|永久久久久久久久|日韩加勒比偷拍网|婷婷伊人久久蜜桃|亚洲理论中文字幕|中文无码黄色Av|三级一区二区三区|超碰在线精品专区|国语对白一级A片

Home|Contact|Members|中文|
Search
Home > News

Ghana president at Bui hydro-station opening

Updated: 2013-12-31

The Bui hydropower station, the country of Ghana's second largest hydropower station, and designed and built entirely by POWERCHINA, was completed on Dec 19, 2013, with three generators in operation. The president of Ghana, Mahama was on hand for the ceremony.

Ghana president at Bui hydro-station opening
 

The station is on the Volta River, 15 km upstream from Lake Volta in the northern part of Ghana, near the Ivory Coast border, and has a total installed capacity of 400 MW. The project had a total cost of $700 million, with the EXIM Bank of China providing 560 million.

Ghana president at Bui hydro-station opening
 

The project is expected to generate about 1 billion kWh annually, or a sixth of the nation's electricity needs, playing an important part in social and economic development in Ghana and western Africa.