欧美日韩性大香蕉|精品无码成人视频|永久久久久久久久|日韩加勒比偷拍网|婷婷伊人久久蜜桃|亚洲理论中文字幕|中文无码黄色Av|三级一区二区三区|超碰在线精品专区|国语对白一级A片

 
Home> News

Qingdao pier project begins caisson installation

Updated: 2014-01-10

  Print Mail Large Medium  Small 0

The Qingdao pier project, contracted for construction by China State Construction Port Engineering Group as part of the national deep-sea base program, began caisson installation recently. The project will be finished by the end of the year.

The pier platform is 280 meters long, 50 meters wide and 10 meters deep. It has an approach bank that measures 393 meters high and 17 meters wide. The side facing the coast is made of caissons and the side facing the sea consists of breakwater structures. The program will consume 800,000 cubic meters of earth and stone.